Street Closures within the Bridge District from Monday, 11/19/12 thru Monday, 11/26/12

City of West Sacramento 25 Year LogoStarting Monday, November 19, 2012 thru Monday, November 26, 2012, the following streets in the Bridge District will be closed to vehicular traffic: Riverfront Street, Bridge Street, Mill Street, Garden Street, and Central Street.

Road closures and signage will be in place and through traffic will be directed to use Fifth Street and Tower Bridge Gateway.  This closure is necessary to allow the City’s contractor, Teichert Construction, to repair/replace defective granite pavers and grouting along Riverfront Street, and allow time for the repairs to cure before vehicular traffic is allowed on the repaired granite pavers.

All streets are to reopen on Monday, November 26, 2012.

Contact: Toby Wong, Senior Civil Engineer at (916) 617-4850.

This entry was posted in General Information, Public Safety, Transportation. | Bookmark the permalink.